DECK SYSTEM FOR CAST IN-SITU
SLABS
Wooden 1-Beam (Wooden Grinder H20)
Suitable for shuttering any shape of reinforced
concrete (R.C)
slabs.
The number of jacks can be reduced by 50%
PASCHAL-DECK is a flexible slab Formwork
system consisting of three main components.
1. Plywood
2. Wooden I-beam (H20 girder)
3. Prop.
The Formwork can be used for
different slab thickness .The
plywood is supported by the H20 girders (here
cross girders). The same timber girders are
also used as the main girder to support the
crossgirders -Support
for the main girders is achieved by the props.
Depending on the load the single parts (girders,
props) can be positioned at the statically required
distance (see table).The flexibility in longitudinal
direction of the girders (main and cross girders)
is achieved by overlappingof the exiting girders.
The static details for the H20 girders are:
Permissible bending moment:
m
=
5.0 kNm.
Permissible transverse Force: Q =
11 KM.